Bathroom Renovation part 4 – Almost Done

I our initial plan/timeline for the bathroom renovation, spring break was going to be the time for me to just enjoy the completed project. Maybe get a few things like new towels and rugs, but the actual renovation would be complete.

Unfortunately due to a few delays (wrong cabinet which delayed the counter measurements and glass fabrication) the bathroom is not done yet. It is usable at this point (yay!) but not complete. We have the glass for the shower to be installed and a few minor things to fix/adjust. Now with the virus and social distancing and limiting contact I’m not sure how that is going to impact the bathroom, but in the grand scheme of things, it isn’t a worry.

The counter with the sinks went in, as did the matching window sill and the end cap for the half wall by the shower, faucets, mirrors and lights went in next and Bob and I added a privacy film to the window. Outlets and light switches got their covers back and we are now in holding mode. It looks good and is usable so we’ve moved our stuff back in and have begin working out the little things – like where to hang towels and who gets what drawer.

img_20200306_063948I’m hoping the final touches will be done soon, but if they aren’t, that’s okay. Whenever it gets done it will be great. The bathroom feels so much bigger now, and the shower is just lovely. I’m still gaga over the tile, especially the shower floor tile. Even Alinea likes it, I think.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s